TransMilenio the battle over Avenida Séptima Carlos H. Mojica. [Case Study]

By: Contributor(s): Material type: TextTextPublication details: Cambridge Harvard University 2011.Description: 25 p. col. ill. ; 30 cmSubject(s): DDC classification:
  • CS0003
Online resources: Summary: This case is designed for use in a course on project management, urban planning or transportation policy to illustrate the political and technical challenges of implementing and sustaining a major reform. In August of 2007, the mayor of Bogota, Luis Eduardo Garzon had to decide whether to proceed with plans to build a Bus Rapid Transit (BRT) line in Avenida Septima, one of the most important transportation corridors in the Colombian capital. The proposed line would be an extension of Bogota's BRT system, called TransMilenio, which had opened in 2000 as the first BRT system to be built in a large metropolis. TransMilenio's modest construction cost, high capacity and excellent quality of service had attracted the attention of urban transportation planners around the world and the system soon became one of the most acclaimed and imitated transportation innovations of its time. But the performance of TransMilenio had deteriorated somewhat over time, as the system expanded. And the latest proposed addition on Avenida Septima posed special technical and political challenges. Elections were only a few months away and by law Garzon could not run for immediate reelection, but the candidate from his party was campaigning on a platform of building a metro instead of expanding the BRT system. Should Mayor Garzon try to lock the city into expanding the BRT by awarding contracts to build Avenida Septima or leave the decision for his successor? ABSTRACT.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)

This case is designed for use in a course on project management, urban planning or transportation policy to illustrate the political and technical challenges of implementing and sustaining a major reform. In August of 2007, the mayor of Bogota, Luis Eduardo Garzon had to decide whether to proceed with plans to build a Bus Rapid Transit (BRT) line in Avenida Septima, one of the most important transportation corridors in the Colombian capital. The proposed line would be an extension of Bogota's BRT system, called TransMilenio, which had opened in 2000 as the first BRT system to be built in a large metropolis. TransMilenio's modest construction cost, high capacity and excellent quality of service had attracted the attention of urban transportation planners around the world and the system soon became one of the most acclaimed and imitated transportation innovations of its time. But the performance of TransMilenio had deteriorated somewhat over time, as the system expanded. And the latest proposed addition on Avenida Septima posed special technical and political challenges. Elections were only a few months away and by law Garzon could not run for immediate reelection, but the candidate from his party was campaigning on a platform of building a metro instead of expanding the BRT system. Should Mayor Garzon try to lock the city into expanding the BRT by awarding contracts to build Avenida Septima or leave the decision for his successor? ABSTRACT.

There are no comments on this title.

to post a comment.

IIHS Bangalore City Campus

No. 197/36, 2nd Main Sadashivanagar Bangalore, Karnataka 560080 India

Phone: 91-80-67606661 Ext: 660 Fax: +91-80-23616814

Email: library@iihs.ac.in

Google Map